It tells you why.
An AI-written note on your logline. Genre finder explains its reasoning, not just the label. The offline suggestions work without AI.

Work out the logline, the characters, and the beats. Then start writing with a plan.
Requires macOS 14 or later on Apple Silicon (M1 or newer).
Free to start · Mac only for now · AI is optional · See pricing
When Andres Cardenas returns to his dying father, Santiago, he must reveal the secret behind the night twenty years ago…
What truth is the protagonist avoiding?
Andres Cardenas arrives at the humble house, greeted warmly by Aunt Carmela Cardenas, sensing his father's final days are near.
Protagonist
Andres enters the dark room to find a frail Santiago. He lights a cigarette for his father, opening the door to old memories.
Does one cause or complicate the next?
At the warehouse, Andres faces the dangerous Tamayo, who decides his fate for breaking the windshield.
Father and son
Cards from a short film in progress.
From chaos
A scene you can't place. Half an idea. A name. Drop it all in, and Storyteller helps you sort it into a logline, a cast, and beats.
When Andres Cardenas returns to his dying father, Santiago, he must reveal the secret behind the night twenty years ago…
What truth is the protagonist avoiding?
Protagonist
Father and son
Andres arrives at the humble house, sensing his father’s final days are near.
Andres enters the dark room to find a frail Santiago.
At the warehouse, Andres faces the dangerous Tamayo.
Why
Notes in one app, a logline in another, characters in your head. Storyteller keeps the idea, the logline, the cast, and the beats in one place, so you know what you're writing before you start.
Guided questions give your idea something to push against.
Idea, logline, cast, and beats live together in one project.
One focused job: helping you plan before you write.
Watch
A quick look at Storyteller in use.
01Spark
A line of dialogue. A question. A sketch. Start from a rough thought, and shape it when you’re ready.
Boards for references, images, and quick sketches. Shape them later.
Test a rough thought offline, or turn it into a project.
02Heart
Read your idea’s genre, blend two, then build your logline one question at a time.
Pick genres, or find them offline. AI when you want it.
Guided questions beside your working logline.
Roles, portraits, and a PDF character sheet.
Family, romance, conflict, alliance.
03People
Give each character a want and a need. Then see how they all connect.
04Beats
Lay out setup, turn, and outcome. Give every beat a purpose, and drag your cast onto it. Story check shows you what’s missing. Then keep the beat sheet open beside the script you’re writing.
Every beat has a purpose, images, and cast.
A floating panel that stays beside your writing app.
05Export
Export your beat sheet and character sheets to keep beside you while you write, as PDF, Word, or a Fountain or Final Draft outline. Story deck, one pager, and postcard are ready when you want to share the idea. Or send it all out in one click.
Seven PDFs in one folder: Inspo, beat sheet, characters, relationships, story deck, one pager, and postcard.
Present it, or export to PowerPoint or PDF.
Export as PDF or HTML.
Export as a PNG.
About
I was working on a new short screenplay and couldn't get past the pile: notes in one place, a logline in another, characters in my head. I didn't need another place to write pages. I needed a place to work out the story first.
So I built it. Storyteller is the tool I wanted: the logline, the characters, and the beats together, before the first page.
Simon QuirozRenegade Shadows Labs
Writers
06Pricing
One project, every planning tool, no credit card.
Free
Every tool. AI on trial.
$0
Need a second project or clean exports? Own is $29.
Join the waitlistOwn
Pay once. Bring your own AI key.
Early bird — first 100$49
$29 one-time
Waitlist members get the early-bird price.
Join the waitlistPro
AI included. Cloud sync coming.
$12.99 /mo
or $129/yr — 2 months free
Pro Max
For heavy AI use
$21.99 /mo
or $219/yr — 2 months free
Students, faculty, and staff get Own for $19 one-time. Ask for the education code.
Every plan includes every planning tool. The differences are projects, exports, AI, and cloud.
| Feature | Free | Own | Pro | Pro Max |
|---|---|---|---|---|
| Best for | Trying it on one idea | Developing stories now and then | Regular AI use, plus cloud sync later | Heavy AI use across many projects |
| Price | $0 | $29 onceearly bird, then $49 | $12.99/moor $129/yr | $21.99/moor $219/yr |
| Projects | 1 | Unlimited | Unlimited | Unlimited |
| Workspaces | 1 | Unlimited | Unlimited | Unlimited |
| Every planning tool | ✓ | ✓ | ✓ | ✓ |
| Story deck, one pager, postcard, export package | ✓ | ✓ | ✓ | ✓ |
| Exports without a watermark | — | ✓ | ✓ | ✓ |
| AI | Trial credits | Your own key, or credit packs | ~300 writing + 50 images a month | ~600 writing + 100 images a month |
| Share a project by link, with optional feedback | $2 each | $2 each | Included | Included |
| Credit packs | ✓ | ✓ | ✓ | ✓ |
| Extra deck themes | — | — | ✓ | ✓ |
| Priority support | — | — | — | ✓ |
| Cloud sync | — | — | Coming soon | Coming soon |
Later: a cloud project manager for shared projects, as a separate monthly add-on. Education: Own is $19 for verified students, faculty, and staff. Mac only for now.
AI is optional. It helps you brainstorm and shape, and it never writes your script. Your projects live on your computer.
Mac only for now (Apple Silicon, macOS 14 or later). More devices are on the way.
Details
An AI-written note on your logline. Genre finder explains its reasoning, not just the label. The offline suggestions work without AI.

Your logline autosaves as you write. Save versions as separate drafts.

Add the stories yours sits beside, and what makes it different. They feed your deck and one pager.

Genre suggestions, templates, and Story check run on their own. AI is there when you want it.

Drop in a script or story as PDF, Final Draft, Fountain, Word, or plain text. Review what it finds before it becomes a project.
In practice
Here's one short film inside Storyteller: an idea, two loglines, seven characters, and eleven scenes, all in one project. Features, series, mini-dramas, novels, and more work the same way.
Early access
Join the waitlist. Lock in $29 to own it.
Get Storyteller
Download Storyteller and start your story today. No credit card, no account.
Download — FreeRequires macOS 14 or later on Apple Silicon (M1 or newer).